Completed Projects : Hotels
Click a project photo or project name for additional photos.
- View sample Hotel layouts: (PDFs)
 |
Project: The Ocean House Hotel and Residence Location: Watch Hill, RI Project Description: The Ocean House Hotel & Residence in Watch Hill, RI opened its doors in early June 2010. This remarkable design by Odeh Engineers of North Providence, RI demonstrates how the Girder-Slab System along with conventional structural steel can be implemented to accommodate a complex architectural layout. The hotel and residence has been designed to retain the original integrity of the historic Ocean House hotel originally build in 1868 on the same site. The new hotel and residence features twenty-four year round residences and 48 boutique hotel rooms. The Girder-Slab System is being distributed by Shepard Steel of Hartford, CT. Architect: Centerbrook Architects and Planners, LLC, Centerbrook, CT Engineer: Odeh Engineers, Inc, North Providence, RI Steel Contractor (Distributor): Shepard Steel Company, Hartford, CT Precast Supplier: J. P. Carrara & Sons, Inc., Vermont
|
 |
Project: Homewood Suites by Hilton Location: Philadelphia, PA Story Height: 11 Project Description: On December 8, 2010 Campus Apartments, LLC of Philadelphia, PA broke ground on what was the only hotel construction start in Philadelphia for the year. This spring an 11-Story extended stay Homewood Suites will rise above the 4100 block of Walnut Street in the University City section of Philadelphia.
Scheduled for completion in March 2012, the 136 suites will offer full kitchens and one bedroom, averaging approximately 500 square feet of total living space. Campus Apartments, LLC recognized the demand for such a hotel to support visitors to nearby health and educational facilities such as the University of Pennsylvania, Penn Medicine, and Children's Hospital of Philadelphia.
Architect: Alesker & Dundon Architects, Philadelphia, PA Engineer: David Chou & Associates, Blue Bell, PA Builder: L.F. Driscoll Company, LLC, Philadelphia, PA Distributor: Samuel L. Grossi & Sons, Inc., Bensalem, PA Precast Supplier: OldCastle Precast
|
 |
Project: aloft Hotel Location: Mt. Laurel, New Jersey Story Height: 6 Square Footage: 91,000 Project Description: The new six story aloft in Mt. Laurel, NJ was completed ahead of schedule and held its grand opening in October 2009. The aloft is one of the newest and most innovative hotels in the Starwood family. Owned by Delco Development, the 91,000 square foot hotel was designed by Newcomer Associates of Chambersburg, PA. The aloft will offer 154 spacious loft-like rooms for visitors to the South Jersey and Philadelphia area. The Girder-Slab System was distributed by The Berlin Steel Construction Company of Malvern, PA. The precast hollow core slabs have been manufactured and supplied by Boccella Precast, LLC of Berlin, NJ. The project is being built by E.P. Guidi of Ambler, PA, and erected by J.L. Erectors of Blackwood, NJ.
Architect: Newcomer Associates, Chambersburg, PA Engineer: Newcomer Associates, Chambersburg, PA Steel Contractor (Distributor): The Berlin Steel Construction Company, Malvern, PA Builder: E.P. Guidi, Ambler, PA Precast Supplier: Boccella Precast, LLC, Berlin, NJ
|
 |
Project: Marriott Courtyard Location: Gaithersburg, Maryland Project Description: 9 Stories, Approximately 121,000 Square Feet Architect: EDI Architects-Planners, Houston, TX Engineer: Haynes Whaley Associates, Houston, TX Steel Contractor (Distributor): Benchmark Fabricated Steel, Terre Haute, IN
|
 |
Project: Westin Hotel Location: Richmond, VA Project Description: The seven story, 150,000 square foot Westin Starwood Hotel was designed by architects Thomas Hamilton & Associates of Richmond, VA and engineered by Dynamic Design, Inc., of Chesterfield County, VA. Scheduled to open in June of 2008, the Westin Richmond will provide 250 upscale rooms to the area, and is the first Girder-Slab project in the state of Virginia. CSE Erectors of Lynchburg, VA , in conjunction with Concrete Systems of Bremen, GA , have been able to erect 22,000 S.F. of steel and plank in two days, equivilant to one floor of the hotel, and grout the same area in one day! Once two elevated slabs were erected, all other trades had been mobilized. The Girder-Slab System is being distributed by Liphart Steel Company of Richmond, VA. The precast hollow core slabs have been manufactured and supplied by Oldcastle Precast, Inc. of Townson, MD. The project is being built by Kenbridge Construction of Kenbridge, VA.
Architect: Thomas Hamilton & Associates, Richmond, VA Engineer: Dynamic Design, Inc., Chesterfield County, VA Steel Contractor (Distributor): Liphart Steel Company, Inc., Richmond, VA
|
 |
Project: Hilton Garden Inn Location: Portsmouth, New Hampshire Architect: LLW Architects, Inc., Memphis, TN Engineer: Veitas & Veitas Engineers, Braintree, MA Steel Contractor (Distributor): Trimax Steel, St. Marie, QC Canada Precast Supplier: J. P. Carrara & Sons, Inc., Vermont Testimonials: "Our decision to use the Girder-Slab System allowed us to erect the building in record time. The General Contractor was able to expedite the overall construction. This resulted in construction cost savings and significant early revenue generation."
- James Brady, President of Olympia Development
|
 |
Project: Country Inn & Suites by Carlson, Newark Airport Location: Elizabeth, New Jersey Project Description: This 7 story, approximately 89,000 Square Foot hotel contains 210 rooms. Architect: Ronald Schmidt & Associates, Englewood, NJ Engineer: O'Donnell & Naccarato, Philadelphia, PA Steel Contractor (Distributor): Samuel Grossi & Sons, Inc., Bensalem, PA
|
 |
Project: Holiday Inn Location: Battle Creek, MI Architect: Design Plus, Inc., Grand Rapids, MI Engineer: JDH Engineering, Inc., Grandville, MI Steel Contractor (Distributor): Genzink Steel, Holland, MI
|
 |
Project: Hampton Inn & Suites Location: Knoxville, TN Project Description: Located at the new Knoxville Convention Center this hotel is 6 stories, approximately 50,000 Square Feet, and has a brick exterior. Installation of the Girder-Slab System was completed in 5 weeks.
Architect: Ross/Fowler, P.C. Architects, Knoxville, TN Engineer: Carpenter Wright Engineers, Knoxville, TN Steel Contractor (Distributor): Towe Iron Works, Inc., Knoxville, TN Builder's Testimonial: "This was our first experience with Girder-Slab. We have built numerous hotels in the Eastern Tenessee area and found that the Girder-Slab System allowed us to maintain maximum speed towards topping out our building. Five weeks after the first steel column was set we were setting the last piece of precast on the sixth floor roof. We were very pleased at the ease and speed of your system, and would recommend it to anyone."
- Alex Davis D&S Builders
|
 |
Project: Sheraton Erie Bayfront Hotel Location: Erie, Pennsylvania Architect: DRS Architects, Pittsburgh, PA Engineer: Atlantic Engineering, Pittsburgh, PA Steel Contractor (Distributor): Amthor Steel, Erie, PA
|
 |
Project: The Inn at Somerset Hills Location: Basking Ridge, New Jersey Project Description: This high-end hotel is 4 Stories and approximately 68,800 Square Feet. Erection Time of the Girder-Slab System was 16 Days. Architect: Walter Pfeiffer ARA, Whitehouse Station, NJ Engineer: O'Donnell & Naccarato, Philadelphia, PA Steel Contractor (Distributor): Fisher Steel, Inc., Bellmawr, NJ
|
 |
Project: Residence Inn by Marriott Location: Portland, ME Architect: Group One, Inc., Boston, MA Engineer: Goldstein Millano, LLC, Reading, MA Steel Contractor (Distributor): Sturo Metal - Levis, QC Canada
|
 |
Project: Renaissance Boston Hotel & Spa at Patriot Place Location: Foxboro, MA Project Description: The Renaissance Patriot Place is located in Foxboro, Massachusetts adjacent to Gillete Stadium, home of the New England Patriots. The 5 story hotel consists of 150 rooms and over 1,800 square feet of meeting space. The Renaissance Boston Hotel & Spa at Patriot Place is the only luxury hotel in Foxborough. Architect: Pro Con, Inc, Hooksett, NH Engineer: Pro Con, Inc, Hooksett, NH Steel Contractor (Distributor): Trimax Steel, Inc., Ste-Marie, Quebec Canada Precast Supplier: J. P. Carrara & Sons, Inc., Vermont
|
 |
Project: Mt. Airy Resorts Casino Hotel Location: Mount Pocono, PA Architect: David Leung, Clarks Summit, PA Engineer: The Harman Group, King of Prussia, PA Steel Contractor (Distributor): Stone Bridge Iron & Steel, Inc., Wilton, NY
|
 |
Project: Holiday Inn Location: Fort Wayne, IN Architect: Dimensions, Inc. Kokomo, IN Engineer: Applied Structural Design, Albion, IN Steel Contractor (Distributor): Assemblers, Inc., Saline, MI
|
 |
Project: Courtyard Marriott Expansion Location: New Haven, CT Architect: Group One, Inc., Boston, MA Engineer: Kahn and Bayer, Manchester, CT Steel Contractor (Distributor): The Berlin Steel Construction Company, Kensington, CT Precast Supplier: J. P. Carrara & Sons, Inc., Vermont
|
 |
Project: Holiday Inn Location: Rock Hill, SC Architect: Abhay H. Pradhan, Charlotte, NC Engineer: Warner Engineering, Waxhaw, NC Steel Contractor (Distributor): Spectrum Fabrication, Columbia, SC
|
 |
Project: Lockheed Martin Center for Leadership Location: Bethesda, MD Architect: Leo A. Daly, Washington, DC Engineer: Leo A. Daly, Washington, DC Steel Contractor (Distributor): Canatal Industries, Thetford Mines, Quebec Canada
|
 |
Project: Staybridge Suites Location: Columbia, SC Story Height: 5 Square Footage: 66,432 Architect: Abhay H. Pradhan, Charlotte, NC Engineer: Warner Engineering, Waxhaw, NC Steel Contractor (Distributor): Spectrum Fabrication, Columbia, SC
|
 |
Project: Staybridge Suites Location: Wilmington, NC Story Height: 5 Square Footage: 65, 950 Architect: Abhay H. Pradhan, Charlotte, NC Engineer: Warner Engineering, Waxhaw, NC Steel Contractor (Distributor): Spectrum Fabrication, Columbia, SC
|
 |
Project: Staybridge Suites Location: North Charleston, SC Story Height: 4 Square Footage: 52,760 Architect: Abhay H. Pradhan, Charlotte, NC Engineer: Warner Engineering, Waxhaw, NC Steel Contractor (Distributor): Spectrum Fabrication, Columbia, SC
|
|
 |
 |
 |